LEAVITT LAND & INVESTMENT PROJECTS
  • Home
  • IRONHORSE
    • Crestline Bungalows
    • Saddleback Ridge
    • The Cliffs at Sunrise
    • Blackstone Townhomes
  • Paradise CCC
  • Other Construction
    • Old Sorrel Hall
    • Founders Hall
  • The Cottages
  • Driscoll Lane
  • The Duplex
  • Northfield Village Remodels
  • 1928 Project
  • Other Photos
    • Residential Projects >
      • Geisking Home
      • Hughes Home
      • Washburn Home
    • Cedar City Happenings
  • Home
  • IRONHORSE
    • Crestline Bungalows
    • Saddleback Ridge
    • The Cliffs at Sunrise
    • Blackstone Townhomes
  • Paradise CCC
  • Other Construction
    • Old Sorrel Hall
    • Founders Hall
  • The Cottages
  • Driscoll Lane
  • The Duplex
  • Northfield Village Remodels
  • 1928 Project
  • Other Photos
    • Residential Projects >
      • Geisking Home
      • Hughes Home
      • Washburn Home
    • Cedar City Happenings

To learn more about Blackstone Townhomes Click Here!

Inside the Units 9 10 2020

Completed and an Open House 8/31/2020

Just a few new shots  8/18/2020

A Few New Aerials 8/13/2020

The Grass is going in also  8/10/2020

Yes Asphalt can be beautiful  8/7/2020

Landscaping is going in and road prep is ready for asphalt  8/6/2020

The Sidewalk is going in 8/4/2020

Stunning Trees going in 7/30/2020

A New View of Blackstone  7/17/2020

The Blackstone Luxury Townhomes detailed finishes 7/13/2020

Blackstone is looking Great: Inside and Out  7/2/2020

The Doors are incredible inside and out.  Great Concrete Work  6/30/2020

Inside and Out, Blackstone is coming together 6/24/2020

Blackstone Concrete Work and an Island 6/19/2020

Curbing has been poured in half of the Project 6/17/2020

Curbing and Sidewalk being prepped - 6/12/2020

Cabinets are going in 6/10/2020

Reber Painting Staining the Doors   6/8/2020

Details Inside and Out 6/2/2020

Blackstone is Really Looking Great 5/20/2020

They are Really Coming Together 5/14/2020

EIFS Complete on the Front of First Unit 5/11/2020

EIFS Going on Front/Garages on Second Units 5/8/2020

Applying EIFS to the Front 5/5/2020

Blackstone - So Much Happening 4/29/2020

The Custom Red Oak Doors are being built 4/22/2020

More EFIS being Installed inside the Carports 4/20/2020

Inside the Blackstone Carports
Note the details on the entrance.
Each Column is defined with the EFIS System
Inside the walls are paint ready.

More EFIS Colors being applied 4/16/2020

The Color is Going On 4/10/2020

The Front Wall Topping in the South & Starting the EFIS System 4/9/2020

The Front Wall is Going Up Around Blackstone 4/6/2020

The Drywall is Going Up 4/2/2020

The Waterproofing  Being Placed on the Exterior  3/31/2020

Aerials 3/28/2020

A Glimpse Inside the Units 3/23/2020

Windows in the East Units, the West Units Catching Up 3/11/2020

Blackstone Townhomes - Carports  and other Progress 3/5/2020

Second single level being built, electrical going in 2/27/2020

 Building roofs, some overhead shots, and installing pipework 2/26/2020

Crew is steady at work 2/25/2020

Framing is going well 2/24/2020

Garage/carport slab going in, electric meters in, working on second story 2/21/2020

Second story on west side going up 2/19/2020

wall is developing nicely and framing is moving quick 2/14/2020

Framing is going well 2/13/2020

Arial shots and progression on west side 2/11/2020

Second floor almost done 2/10/2020

Another productive week 2/7/2020

Putting up second floor and framing west side 2/5/2020

Town-homes are going up nicely 2/4/2020

Been a very productive week 1/31/2020

Finishing second slab, progressing on framing 1/30/2020

First floor frames almost done, second slab poured 1/28-29/2020

Frames going up quick along with wall 1/27/2020

Walls going up, Cable going into the ground 1/24/2020

Almost ready for framing to start 1/23/2020

Pouring Slab 1/20/2020

Picture
Picture

Wall is going up quickly, Ready to pour slab 1/16/2020

Making Progress on wall/prepping slab  1/14/2020

Picture
Picture

Starting Wall & Preparing Slab 1/7/2020

Footings Inspection Passed and Back to Work 1/7/2020

Working on Footings and Plumbing 1/6/2020

New Rendering of Six Plex 12/30/2019

Picture

Arial Shots of Foundation & Footings 12/30/2019

Progress on Blackstone just before Christmas 12/24/2019

Footings Poured on West Side 12/23/2019

Getting Ready to Pour Footings on West Side 12/20/2019

Arial Pictures of Blackstone 12/19/2019
​

Making progress, working on west side footings 12/18/2019

Installing foundation walls, getting ready for footings on West side 12/17/2019

Installing re bar, ready for the next step 12/16/2019

Pouring the Footings 12/12/19

Prepping Footings 12/11/19

Digging the Foots and Cracking Some Rock 11/21/18

More Site Prep at Blackstone 11 14 19

Crestline at Blackstone Block Wall   11 6 2019

Getting the Pads Ready for Blackstone  10/16/19

Updated but Not Final Rendering - Oct 11, 2019​

Picture

Updated Fiveplex Elevations Oct 10/10/19

Picture
Picture
Picture

Latest Rendering of Blackstone Townhomes - September 2, 2019

Picture

The Fiveplex

Building the Pad - Sept 17, 2019

Site Plans

Picture

Work Begins - August 5, 2019

Elevation Coloration Examples

Iron Horse Fiveplex

Iron Horse Sixplex