Asphalt is in and exterior is being prepped 11 3 2020
Final Prep for Asphalt and SIdewalks 10 22 2020
Getting ready for pavement, sidewalk, etc. 10 8 2020
Outside Sheeting on, Now moving on roof and inside 10 2 2020
Framing Going Up 9 23 2020
Aerials of PCCC 5/18/2020
Fourth Slab is Finished 5/12/2020
2 Slabs Poured and two to go 4/17/2020
Pouring Slab 2 4/10/2020
Slab 1 Ready to go and Slab 2 is ready to pour 4/8/2020
Pouring the Building 1's Slab 4/3/2020
3 Buildings are On there Way - 4/1/2020
Retaining Wall, Building 1 Footing Forms, & Building 2 Piers 3/12/2020
building wall, digging trenches 2/27/2020
Digging trenches 2/24/2020
leveling ground 2/14/2020
making progress 2/10/2020
digging trenches and moving dirt 2/7/2020
Evened out ground, cleared lot 1/31/2020
Broke ground, started leveling for foundation 1/28-30/2020
In One Day, Masonry Wall nears Completion 4/28/2019
From Humble Beginnings a Project Starts 4/15/2019
The Site Plan
The Elevations
This is your location for small business or incubator space. Phase 1 will consist of 1,000 SF up to 4,000 SF. Located just one block off Main Street you are visible and yet have a location that is friendly to business.